Projects - Commercial

SEA LIFE MELBOURNE AQUARIUM

DETAILSConstruction of aquarium
OWNERMerlin Entertainment
CONSULTANTSPeddle Thorp Architects

Bonacci Engineers

LOCATIONMelbourne, VIC, Australia
SCOPE* KIM concrete admixture applied to the piles and pile capping walls on this project site.

END 2 END

DETAILSConstruction of 5 storey office and retail building featuring 3 trains on the roof.
CONTRACTORSKalitek Constructions
CONSULTANTSBCE Design - Engineers

ITN Architects

LOCATIONCollingwood, VIC
SCOPE* Krystol Internal Membrane (KIM) concrete admixture was applied to the concrete roof of this office and retail building.

OSKARS ON BURLEIGH RESTAURANT

DETAILSRemedial job - repair the leaking roof - as part of the refurbishment of pavilion building
OWNERQLD State Government
CONTRACTORSWetlock Waterproofing
CONSULTANTSMarchese Architects
LOCATIONGold Coast QLD
SCOPE* Polyglass Mapeplan TM sheet membranes were applied to the roof of this restaurant.

255 ELIZABETH ST, SYDNEY

DETAILSRefurbishment of existing commercial office building
OWNERInvesta Group
CONTRACTORSFDC Construction & Fitout Pty Ltd
LOCATIONSydney CBD, NSW, Australia
SCOPE* KGM liquid membranes were applied to the large external terrace.

EXCHANGE ON SOMERSET

DETAILSConstruction of retail space and commercial offices
OWNERIPC Holdings
CONTRACTORSDickinson Property Group
LOCATIONNarellan, Sydney, NSW, Australia
SCOPE* Krystol Internal Membrane (KIM) concrete admixture was applied to the lift pits and external slab areas.

* Hyperseal DB & BR waterstops were applied to the construction joints.

* KGM 100, 200 and 500 liquid membranes were applied to the internal wet areas.

161 CASTLEREAGH ST, SYDNEY

DETAILSConstruction of new commercial office building
OWNERISPT, LaSalle Investment Mgmt & GPT
CONTRACTORSGrocon
CONSULTANTSBCE Design Engineers

ITN Architects
LOCATIONSydney CBD
SCOPE* Krystol Internal Membrane (KIM) admixture was applied to the basement of this project.

* Hyperseal Waterstops were also used.

HEADLANDS HOTEL

DETAILSConstruction of hotel, restaurants and 61 apartments
CONTRACTORSStevens Group
CONSULTANTSMartin Morris & Jones
LOCATIONAustinmer, Wollongong, NSW
SCOPE* KGM-100, KGM-200, KGM-300 liquid membranes were applied to the outdoor terraces, retaining walls & bathrooms

* Polyglass Polyfond Kit Drain was used on the planter boxes

HOME HUB - SYDNEY BUSINESS PARK

DETAILS256ha Commercial development with bulky goods - Bunnings, Ikea, Aldi, Costco, Lindt
OWNERMarsden Park Developments
CONTRACTORSFDC
CONSULTANTSReid Campbell architects; Calibre Group engineers
LOCATIONMarsden Park, Sydney, NSW
SCOPE* Krystol Internal Membrane (KIM) Admixture was applied to the Level 1 Roof slab and lift pits

* Hyperseal DB waterstops were applied to the Level 1 Roof slab and lift pits

CONNECT CORPORATE CENTRE

DETAILS

Construction of new commercial centre, hotel & retail facilities

OWNERGoodman Properties
CONTRACTORSTaylor Construction
CONSULTANTSWMK Architecture, SCP Consulting Pty Ltd - Engineers
LOCATIONMascot, NSW
SCOPE
  • * Krystol Internal Membrane (KIM) admixture was applied to the lift pits and tie bolt holes
  • * Hyperseal DB waterstops were also applied in these areas

FREMANTLE DOCKERS/COCKBURN AQUATIC AND RECREATION CENTRE

DETAILSConstruction of new training and administration facility for the Fremantle Dockers Football Club and new aquatic and recreation centre.
OWNERCity of Cockburn, the Fremantle Dockers football club and Curtin University
CONTRACTORSBrookfield Multiplex
LOCATIONCockburn, WA
SCOPE * Krystol Internal Membrane (KIM) was applied to the retaining walls of this project

HORNSBY COMMERCIAL OFFICE (REMEDIAL)

DETAILSRemedial job - repair leaking roof of commercial office building
CONTRACTORSTitan Waterproofing
LOCATIONHornsby, Sydney, NSW
SCOPE* Plana P and Evolight S Mineral sheet membranes were applied to the roof