CONCRETE WATERPROOFING

102 Krystol Specification guide
101 Krystol Broadcastâ„¢ Application using Dry Broadcast Method
102 Use of KIM® admixture: Instructions for mix design & batch plant
103 Use of KIM® admixture: Instructions for ready-mix truck driver
104 Use of KIM® admixture: Instructions for site superintendent
105 Use of KIM® admixture: Instructions for placers & finishers
106 Use of KIM® admixture - Instructions for quality control testing
107 Use of KIM® admixture: Instructions for shotcrete nozzleman and crew
108 Use of KIM® admixture: Instructions for shotcrete inspector

JOINT WATERPROOING

201 Krystol® waterstop system (Internal Method) - wall to slab
202 Krystol® waterstop system (External Method) - wall to slab
203 Krystol® waterstop system (Shotcrete) - Horizontal and Vertical Construction Joints
204 Treatment of Unintended Cold Joints When Bench Gunning

REPAIR METHODS

301 Instructions for installing the Krystol® Crack Repair System
302 Waterproofing form - Tie Holes
303 Waterproofing Pipe Penetration
304 Waterproofing an Existing Drywell

SURFACE APPLIED

401 Surface preparation prior to Krystol® Application

News

Stockland Shellharbour Shopping Centre.

Krystol Group have been awarded the concrete waterproofing requirements for Stockland Shellharbour project, estimated 10,000m3 of Krystol Internal Membrane (KIM) to be utilised.
Read more.

Acceptance!

Krystol Group gains acceptance and approval from three major consulting engineering firms.
Read more.

Energy Australia Contract

Energy Australia Ð Training Centre Silverwater project on the way.
Read more.

Sydney Desalination Plant

Krystol Group completes waterproofing requirements for Sydney Desalination Plant.
Read more.

Krystol Wins 700m Pour!

Krystol Group won the contract for the supply and installation of KIM waterproofing admixture to the Kambala High School Project.
Read more.